Parsvnath Pleasant

Specifications

Flooring

Vitrified tiles flooring in drawing/dining room & laminated wooden flooring in master bedroom and vitrified tiles in other bedroom, Non-skid tiles flooring in toilets and kitchen. Combination of marble/vitrified tiles/granite/Kota stone.

Doors & Windows

Hardwood doors and frames duly painted or equivalent. All doors to be flush door of 35mm and main teak wood entrance door to be paneled on both sides duly polished; Aluminium windows.

 

Bathrooms

Provisions of hot and cold water pipes sanitary/chinaware of branded make such as Hindustan/Parry/Cera or equivalent branded chrome-plated fixtures. Mirror of appropriate size in all bathrooms. Glazed tiles up to ceiling with towel rail, etc. Bath tub in the bathroom attached with master bedroom.

 

Hardware

Shutter hinges in brass/steel. All other hardware in brass/steel. All doors except those in bathrooms and kitchen to be provided with a mortise lock.

 
 

Internal Finishes

Acrylic paint/oil bound distemper in pleasing shades in drawing/dining room and dry distemper in bedrooms. POP cornices in drawing/dining room and all bedrooms.

 
 

External Finishes

Textured Finish

 
 

Electrical Work

Electrical work with copper wires in concealed PVC conduits. Provision shall be made for sufficient lighting and power points. Switches and sockets, telephone and TV points in each bedroom, drawing/dining room.
 
 

Electrical/Fixtures

Florescent tunes in all bedrooms, drawing/dining room.
 
 

Air-conditioning

Split air-conditioning in drawing, dining and all bedrooms through individual units.

 
 

Gas Supply

Provision for piped gas supply

 
 

Connectivity

Provision for broadband internet connectivity

 

Location MAp

Floor Plan

Plan A : Down Payment Plan (with 10% Rebate)
At the time of booking 10%
Within 45 days of booking 75% + Car Parking + EDC + IDC +PLC
At the time of offer of possession 5%
 
Plan B : Construction Linked Payment Plan
At the time of booking 10%
Within 45 days of booking 15%
Within 90 days of Booking/Start of Foundation 7% + 50% of ( EDC + IDC)
Within 135 days of Booking/Start of Basement Roof 7% + 50% of (EDC + IDC)
Within 6 months of Booking/Start of First Floor 7% + Car Parking +PLC
On Start of Third Floor Roof Slab / 9 months, whichever is later 7%
On Start of Fifth Floor Roof Slab / 12 months, whichever is later 6%
On Start of Seventh Floor Roof Slab/ 15 months, whichever is later 6%
On Start of Nineth Floor Roof Slab / 18 months, whichever is later 6%
On Start of Eleventth Floor Roof Slab / 21 months, whichever is later 6%
On Start of Top Floor Roof Slab / 24 months, whichever is later 6%
On Start of Internal Plaster / 27 months, whichever is later 6%
On Start of Flooring / 30 months,whichever is later 6%
At the time of offer of possession 5%

Plans Available

bhk Apartment Space Price on Request
3 Bed Apartment 1855 sq.ft Rs.39.88
4 Bed Apartment 1855 sq.ft. 40.83 Lac